The Committee received report ES/1801 of the Head of Planning and Coastal Management which related to planning application DC/23/3977/RG3. The application sought full planning permission for the demolition of the existing single storey café kiosk, store and public WC block and the erection of a two-storey building.
The application was before the Committee for determination as East Suffolk Council were both the applicant and landowner.
The Committee received a presentation from the Senior Planner, who was the case officer for this application. The site’s location plan and an aerial photograph of the site was displayed. Photographs showing the site in context were shared with the Committee along with existing and proposed elevations. The proposed site plan was shown, highlighting the new building alongside the enlarged lower promenade area, facilitating a turning area for emergency vehicles and the two-storey development with the lift shaft up to Jubilee Parade enabling increased accessibility.
The material planning considerations and key issues were summarised as principle, economic considerations, design and heritage, amenity, accessibility and highways, coastal erosion, flood risk, sustainability and other matters.
The recommendation to delegate authority to the Head of Planning and Coastal Management to approve the application was outlined to the Committee.
The Chair invited question to the Senior Planner.
The Senior Planner confirmed to Councillor Ashdown that the lift would provide access to the café. A further regarding when the lift would be in use was referred to the applicant.
Following no further questions, the Committee heard from Sarah Foote (SF) from Lowestoft Town Council.
In response to the query from Councillor Hammond regarding Lowestoft Town Council’s objection, SF clarified that there was an administrative error in the response and this had been corrected on the update sheet.
Town council considered application and welcomes certain aspects in particular public toilets and changing facilities easy reach of south beach.
To support the application requested that members took into consideration the following:
- Heritage impact statement does not align with the South Lowestoft Kirkley area appraisal as being an area of interest.
- Possible loss of amenity – concern about the post development storage space for Lowestoft volunteer lifeguards.
- Reassurance that the existing business is being supported which is much loved and much used.
The Chair invited questions to Lowestoft Town Council. Councillor Ashton asked the Senior Planner to clarify if the second two points raised by SF were material planning considerations. In response the Senior Planner confirmed that they were not necessarily, however this would be covered as part of the applicant’s representation. Councillor Ashton made a personal commitment to take forward those two points.
There being no further questions the Committee heard from Richard Best, the applicant.
RB outlined the plans to deliver another positive phase of the seafront regeneration programme building with the project providing a first-floor restaurant with balcony, 5 new concession spaces, 2 for existing tenants and 3 for leisure. A new lift was proposed which would comply with DDA standards and would improve access and be available to all users. Modern public toilet facilities and outdoor showers would be development, and further public realm enhancements including lighting to encourage evening use. There would be outside seating and a turning circle for service and emergency vehicles. To summarise the project would provide new jobs, improve public realm and replace a tired existing building with a new seafront facility to support and improve the tourism economy.
The Chair invited question to RB. In response to a question from the Chair, RB confirmed that they had been working closely with both existing tenants to agree satisfactory short-term measures during the construction phase and long term more permanent outcomes once the construction was completed, adding legal teams had been instructed and they were making good progress.
Councillor Pitchers asked if there were any plans to change the cliff face landscape – RB confirmed there were no plans to affect landscape or biodiversity to the cliff itself other than the green roof proposal for the first-floor restaurant. Jerene Irwin, architect, confirmed that there were ongoing conversations with the ecologist to ensure the biodiversity was enhanced as part of the development.
There being no further questions, the Chair invited Ward Member, Councillor Byatt to speak. Councillor Byatt whole heartedly welcomed the proposal, particularly the modernisation of the area, the lift access, the potential solution for the voluntary lifeguards, improved lighting, cliff face diversity and the emergency and service vehicle turning space.
In response to a question from Councillor Ewart, Councillor Byatt confirmed it would be an East Suffolk Owned Building with the tenants still to be announced.
Following no further questions, the Chair invited the Committee to debate. Councillor Ashdown stated that he very much appreciated everything that was going, it was desperately needed, and he was more than happy recommend approval of this application. Councillor Pitchers, as Ward Member, also welcomed the development and seconded the proposal.
Councillor Gee welcomed the concept however was very unhappy with the design of the building, it appeared angular and ugly and not sympathetic with the landscape. In response the Senior Planner confirmed there was a condition on the approval to finalise the materials on the lift shaft following ongoing discussion with the design and conservation team. The Planning Development Manager confirmed that there could be further work to improve the aesthetics of it.
Councillor Ewart agreed it was important to consider the design element and gave an example of developments in Yorkshire.
There being no further debate the Chair moved to a vote and it was by a majority
RESOLVED
that planning permission be granted subject to receipt of comments from the Coastal Management raising no objections, and with the conditions set out in this report.
Conditions:
1. The development hereby permitted shall be begun within a period of three years beginning with the date of this permission.
Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 as amended.
2. The development hereby permitted shall be completed in all respects strictly in accordance with:
- Site Location Plan, 210 P2, received 16/10/2023;
- Proposed Site Layout Plan, EEPT-212 P2, received 16/10/2023;
- Landscape Layout, 0501 P04, received 16/10/2023;
- Proposed Elevations, EEPT-301 P4, received 16/10/2023;
- Proposed Ground Floor with Landscape, EEPT-202 P5, received 16/10/2023;
- Proposed First Floor & Roof Plans, EEPT-203 P5, received 16/10/2023;
- Proposed Upper Promenade with Landscape, EEPT-204 P5, received 16/10/2023;
- Coastal Erosion Vulnerability Assessment, 218414-CCL-ZZ-XX-RP-C-05000 Rev:P01, received 16/10/2023;
- Design and access Statement, 6873 / Rev P1 / October 2023, received 16/10/2023;
- Flood Risk Assessment and Drainage Strategy, 218414-KS-00-XX-RP-C-001 Rev:P01, received 16/10/2023;
- Control of odour & noise associated with a commercial kitchen, EEPT-CF-ZZ-XX-RT-A-6899, received 01/12/2023;
for which permission is hereby granted or which are subsequently submitted to and approved by the Local Planning Authority and in compliance with any conditions imposed by the Local Planning Authority.
Reason: For the avoidance of doubt as to what has been considered and approved.
3. The materials and finishes shall be as indicated within the submitted application (except for the cladding to the lift shaft) and thereafter retained as such, unless otherwise agreed in writing with the local planning authority.
Reason: To ensure the satisfactory appearance of the development in the interests of visual amenity
4. Prior to first use of the building, hereby approved, a Flood Warning and Evacuation Plan shall be submitted to and approved in writing by the Local Planning Authority. The Flood Warning and Evacuation Plan shall be created in conjunction with the submitted and approved Flood Risk Assessment (reference 218414-KS-00-XX-RP-C-001 and dated October 2023)
Reason: To ensure the proposal is flood resilient and safe in the event of flooding
5. Prior to the installation of any fixed plant or machinery (e.g., heat pumps, compressors, extractor systems, air conditioning plant or refrigeration plant), a noise assessment should be submitted to include all proposed plant and machinery and be based on BS4142:2014+A1:2019.
A noise rating level (LAr) of at least 5dB below the typical background sound level (LA90,T) should be achieved at the nearest noise sensitive receptor. Where this noise rating level cannot be achieved, details of any noise mitigation measures considered should be explained and the achievable noise level should be identified and justified.
All equipment and/or measures included within the approved noise assessment should be installed in accordance with the approved details.
Reason: To protect the amenity of the area.
6. With reference to best practice contained within the latest edition of EMAQ+ Guidance "Control of Odour and noise from Commercial Kitchen and Exhaust Systems", all extract ventilation shall be vented via a filtered system, capable of preventing cooking odours, fumes, grease, dust, smoke and droplets from escaping the premises.
Before the installation of such a system, details of -
- Type, size and location of the filtration plant, ventilation or similar equipment,
- The sizes and route of the ductwork, and
- The exact location of the final discharge point, including details of odour control and filtration equipment proposed to be fitted.
These details shall be submitted to and approved by the Local Planning Authority prior to the first use of the kitchen. Only the approved scheme shall be installed at the premises and shall be fully functional prior to the first operation of the business, and be retained thereafter.
Reason: To protect the amenity of the area.
7. Development must be undertaken in accordance with the ecological avoidance, mitigation and enhancement measures identified within the Preliminary Ecological Appraisal (PEA) (Wilder Ecology, October 2023) as submitted with the planning application and agreed in principle with the local planning authority prior to determination.
Reason: To ensure that ecological receptors are adequately protected and enhanced as part of the development.
8. No works to or demolition of buildings or structures that may be used by breeding birds shall take place between 14th February and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds' nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/ or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority.
Reason: To ensure that nesting birds are protected.
9. Prior to the removal and/or replacement of any of the cliff top wall along the upper promenade, full details of the any of the repairs and/or replacements shall be submitted to and approved in writing by the local planning authority.
Reason: To preserve the character and appearance of the Conservation Area.
10. Prior to any new works of construction above slab level, full details of both hard and soft landscape works shall be submitted to and approved in writing by the Local Planning Authority. These details shall include proposed finished levels or contours; means of enclosure; hard surfacing materials, and any necessary proposed functional services above and below ground. Soft landscape works shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed number/densities where appropriate; implementation programme.
The landscaping scheme shall be completed within 6 months from the completion of the proposal, or such other date as may be agreed in writing with the Local Planning Authority. Any trees or plants which die during the first 5 years shall be replaced during the next planting season.
Reason: To ensure the provision of amenity afforded by appropriate landscape design.
11. Prior to construction of the bin storage areas, full details of the bin storage, including means of enclosures, shall be submitted to and approved in writing by the Local Planning Authority. The approved bin storage areas shall then be constructed and made available prior to first use of the development hereby permitted.
Reason: To preserve the character and appearance of the Conservation Area.
12. Prior to their first use on site, full details of the proposed cladding material to the lift shaft shall be submitted to and approved in writing by the Local Planning Authority. The lift shaft shall then be clad with the approved materials prior to its first use.
Reason: To preserve the character and appearance of the Conservation Area.