The Committee received report ES/0540 of the Head of Planning and Coastal Management, which related to planning application DC/20/0135/FUL.
The application site was located within the Rendlesham District Centre and currently comprised an area of open land. Previously, Rendlesham Sports Centre was located on the site. The application proposed the erection of 11 affordable homes and three retail units with associated access and parking.
The application was presented to the Committee on 21 July 2020 and it resolved to grant planning permission for the development, subject to completion of a Section 106 Agreement. No decision had been issued as the Section 106 Agreement had not been finalised.
Since the resolution to approve the application, the Council had adopted the new Suffolk Coastal Local Plan. Within the new Local Plan were some policies which required further provisions, above what the former Local Plan had required. Therefore, as any decision made after the adoption of the new Local Plan required the application to be determined in accordance with this document, it was considered prudent that the application be presented to the Committee for it to consider the proposal with full weight being given to the new Suffolk Coastal Local Plan.
The proposal had not changed since it was previously considered by the Committee, with the exception of the addition of electric car charging points and a contribution to Suffolk County Council for secondary school transport by Section 106 agreement, and whilst it was not clear that the current proposal complied in all respects with the new Local Plan, the additional requirements were technical and did not affect the principle of the development.
Prior to the presentation, the Chairman invited the Planning Manager to address the Committee on a recent development with the application. The Planning Manager explained that a request had been made to the Secretary of State for Housing, Communities and Local Government for him to call in the application for determination. The Committee was advised that this request did not impact on the Committee making a decision on the application today but that the Council would need to inform the Secretary of State of the Committee's decision and the issue of any planning permission would be delayed until a decision had been made on whether the application is to be called in.
The Chairman invited questions to officers.
The Senior Planner advised that officers were unaware of the rationale for the call-in request at this time.
The Committee received a presentation on the application from the Senior Planner, who was acting as the case officer. The Committee was advised of a further letter of objection that had been received from Rendlesham Parish Council, which was contained in the update sheet published on 26 October 2020.
The site's location was outlined, and the Committee was shown photographs of views in and out of the site from various different locations.
The proposed site layout, elevations and floor plans were displayed.
The main considerations were stated to be the principle of development previously being considered acceptable and that policy change had occurred (particularly the adoption of the new Suffolk Coastal Local Plan).
The recommendation to approve planning permission, as set out in the report, was outlined to the Committee.
There being no questions to the officers the Chairman invited the Committee to debate the application that was before it.
Members of the Committee considered there were no significant changes that changed their minds from the original resolution in July 2020. Members considered the scheme to be a positive one and making good use of a redundant site.
There being no further debate the Chairman moved to the recommendation to approve planning permission, as set out in the report.
On the proposition of Councillor Deacon, seconded by Councillor Yule it was by unanimous vote
RESOLVED
That the application be APPROVED subject to controlling conditions below and the completion of a Section 106 Agreement to secure the affordable housing and a contribution to secondary school transport.
1. The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission.
Reason: This condition is imposed in accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
2. The development hereby permitted shall be completed in all respects strictly in accordance with Drawing Nos. 7641 24B and 7641 25, Planning Statement, Design and Access Statement and Preliminary Ecological Appraisal received 3 March 2020, Ground Investigation Reports received 17 March 2020, Flood Risk Assessment received 16 April 2020, Drawing Nos. 7641 21B, 23D and SLSP/15/0002 Rev 2 received 22 May 2020, External Timber Bin Storage received 9 July, 7641 20P received 24 August 2020, Air Quality Report received 14 September 2020 and Ground Investigation Report reference TEB/ABS/17.347A and DJM/17.347/ADD for which permission is hereby granted or which are subsequently submitted to and approved by the Local Planning Authority and in compliance with any conditions imposed by the Local Planning Authority.
Reason: For the avoidance of doubt as to what has been considered and approved.
3. The materials and finishes shall be as indicated within the submitted application and thereafter retained as such, unless otherwise agreed in writing with the local planning authority.
Reason: To ensure the satisfactory appearance of the development in the interests of visual amenity.
4. The construction of Plots 1 to 5 shall not be commenced until the new Sycamore Drive vehicular access, located to the east of Plots 1 to 5, has been laid out and completed in all respects in accordance with the Site Access Strategy Drawing No.SLS P/15/0002 Rev 2; with clear visibility at a height of 0.6 metres above the carriageway level cleared and thereafter permanently maintained in that area between the nearside edge of the metalled carriageway and a line 2.4 metres from the nearside edge of the metalled carriageway at the centre line of the access point (X dimension) and a distance of 41.4 metres in each direction along the edge of the metalled carriageway from the centre of the access (Y1 dimension), and with clear visibility at a height of 0.6 metres above the footway/cycle track level cleared and thereafter permanently maintained in that area between the back of the footway/cycle track and a line 2.4 metres from the back of the footway/cycle track at the centre line of the access point (X2 dimension) and a distance of 15.8 metres in each direction along the back edging of the footway/cycle track from the centre of the access (Y2 dimension). Thereafter the access shall be retained in the specified form.
Reason: To ensure that the access is designed and constructed to an appropriate specification. Site Specific Reason: Due to the locational relationship between the building line, the access centreline, the curved kerb and edging lines and the HV cable easement areas, this condition is required to ensure that the building frontage of Plots 1 to 5 does not conflict with the required minimum visibility splays that are to be formed with Y dimensions measured along the relatively tight radius carriageway and back of cycle track edge lines.
5. Within 3 months of the commencement of development, details of the areas to be provided for residents and employees', secure covered cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose.
Reason: To ensure the provision of long term cycle storage in accordance with Suffolk Guidance for Parking (2019).
6. Within 3 months of the commencement of development, details of electric vehicle chargingpoints shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose.
Reason: To ensure the provision of electric vehicle charging points in accordance with Suffolk Guidance for Parking (2019).
7. Before the development is commenced details shall be submitted to and approved in writing by the Local Planning Authority showing the means to prevent the discharge of surface water from the development onto the highway. The approved scheme shall be carried out in its entirety before the access is first used and shall be retained thereafter in its approved form.
Reason: To prevent hazards caused by flowing water or ice on the highway.
8. The use shall not commence until the areas within the site shown on Drawing Number 7641- 20-REV-P for the purposes of loading, unloading, manoeuvring and parking of vehicles, and retail element visitor cycle parking, has been provided and thereafter that area(s) shall be retained and used for no other purposes.
Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles, and retail visitor cycle parking, in accordance with Suffolk Guidance for Parking (2015) where on-street parking and manoeuvring would be detrimental to highway safety.
9. The areas to be provided for storage of Refuse/Recycling bins as shown on drawing number 7641-20-REV-P shall be provided in its entirety before the development is brought into use and shall be retained thereafter for no other purpose.
Reason: To ensure that refuse recycling bins are not stored on the highway causing obstruction and dangers for other users.
10. Before the development is commenced, a Service Management Plan (SMP) regarding the retail units shall be submitted to and approved in writing by the Local Planning Authority. The Service Management Plan (SMP) shall describe the means of servicing and times of deliveries and means provision for servicing/delivery vehicles. The SMP should identify exactly how and what types of vehicles are anticipated for the commercial uses and their delivery times should also be detailed to demonstrate that the proposed system would work. Any measures described in the SMP shall be implemented within the time period identified and adhered to thereafter.
Reason: In the interests of highway safety, the SMP is required to ensure that the impact from retail unit service and delivery traffic operations on existing users of Walnut Tree Avenue is minimised.
11. Prior to commencement of any residential dwelling hereby approved, a Traffic Regulation Order (TRO) shall be progressed that seeks to extend the existing on street waiting prohibition to prevent parking on the inside bend of Sycamore Drive obstructing the western visibility splay of the new access east of Plots 1-5. Prior to the commencement of development, the developer shall deposit a sum of £15,000.00 to cover Suffolk County Council's costs and fees associated with progressing and implementing the TRO. Five years after the development's formal completion date, any balance of the £15,000.00 remaining shall be returned to the developer.
Reason: In line with MfS guidance the development is such that a TRO is required to ensure that parked vehicles would not interrupt visibility splays in order to make the application acceptable.
12. No development shall commence until details of the strategy for the disposal of surface water on the site have been submitted to and approved in writing by the local planning authority.
Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal, to ensure that the proposed development can be adequately drained.
13. No development shall commence until details of the implementation, maintenance and management of the strategy for the disposal of surface water on the site have been submitted to and approved in writing by the local planning authority. The strategy shall be implemented and thereafter managed and maintained in accordance with the approved details.
Reason: To ensure clear arrangements are in place for ongoing operation and maintenance of the disposal of surface water drainage.
14. Within 28 days of completion of the last dwelling/building become erected details of allSustainable Drainage System components and piped networks have been submitted, in an approved form, to and approved in writing by the Local Planning Authority for inclusion on the Lead Local Flood Authority's Flood Risk Asset Register.
Reason: To ensure that the Sustainable Drainage System has been implemented as permitted and that all flood risk assets and their owners are recorded onto the LLFA's statutory flood risk asset register as per s21 of the Flood and Water Management Act 2010 in order to enable the proper management of flood risk with the county of Suffolk.
15. No development shall commence until details of a Construction Surface Water Management Plan (CSWMP) by a qualified principle site contractor, detailing how surface water and storm water will be managed on the site during construction (including demolition and site clearance operations) is submitted to and agreed in writing by the local planning authority. The CSWMP shall be implemented and thereafter managed and maintained in accordance with the approved plan for the duration of construction. The approved CSWMP and shall include:
a) Method statements, scaled and dimensioned plans and drawings detailing surface water management proposals to include :-
i. Temporary drainage systems
ii. Measures for managing pollution / water quality and protecting controlled waters and watercourses
iii. Measures for managing any on or offsite flood risk associated with construction
Reason: To ensure the development does not cause increased flood risk, or pollution of watercourses or groundwater. This condition is a pre commencement planning condition and requires details to be agreed prior to the commencement of development to ensure flooding risk as a result of both construction and use of the site is minimised and does not result in environmental harm or even risk to life.
16. Development must be undertaken in accordance with the ecological avoidance, mitigation, compensation and enhancement measures identified within the Preliminary Ecological Appraisal (PEA) (Practical Ecology, January 2020).
Reason: To ensure that ecological receptors are adequately protected and enhanced as part of the development.
17. Prior to occupation, a "lighting design strategy for biodiversity" for the site shall be submitted to and approved in writing by the local planning authority. The strategy shall:
a) identify those areas/features on site that are particularly sensitive for biodiversity likely to be impacted by lighting and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and
b) show how and where external lighting will be installed (through the provision ofappropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority.
Reason: To ensure that impacts on ecological receptors from external lighting are prevented.
18. Prior to commencement an Ecological Enhancement Strategy, addressing how ecological enhancements will be achieved on site, will be submitted to and approved in writing by the local planning authority. Ecological enhancements measures will be delivered in accordance with the approved Strategy.
Reason: To ensure that the development delivers ecological enhancements.
19. No development (including any construction, demolition, site clearance or removal of underground tanks and relic structures) approved by this planning permission, shall take place until a detailed remediation method statement (RMS) has been submitted to, and approved in writing by, the LPA. The RMS must include, but is not limited to:
- details of all works to be undertaken including proposed methodologies, drawings and plans, materials, specifications and site management procedures;
- an explanation, including justification, for the selection of the proposed remediation methodology(ies);
- proposed remediation objectives and remediation criteria; and
- proposals for validating the remediation and, where appropriate, for future maintenance and monitoring.
The RMS must be prepared by a competent person and conform to current guidance and best practice, including CLR11.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
20. Prior to any occupation or use of the approved development the RMS approved under condition 19 must be completed in its entirety. The LPA must be given two weeks written notification prior to the commencement of the remedial works.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
21. A validation report must be submitted to and approved in writing by the LPA prior to any occupation or use of the approved development. The validation report must include, but is not limited to:
- results of sampling and monitoring carried out to demonstrate that the site remediation criteria have been met;
- evidence that any RMS approved in pursuance of conditions appended to this consent has been carried out competently, effectively and in its entirety; and
- evidence that remediation has been effective and that, as a minimum, the site will not qualify as contaminated land as defined by Part 2A of the Environmental Protection Act 1990.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
22. In the event that contamination which has not already been identified to the Local Planning Authority (LPA) is found or suspected on the site it must be reported in writing immediately to the Local Planning Authority. Unless agreed in writing by the LPA no further development (including any construction, demolition, site clearance, removal of underground tanks and relic structures) shall take place until this condition has been complied with in its entirety. An investigation and risk assessment must be completed in accordance with a scheme which is subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and conform with prevailing guidance (including BS10175:2011+A1:2013 and CLR11) and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority.
Where remediation is necessary a detailed remediation method statement (RMS) must be prepared and is subject to the approval in writing of the Local Planning Authority. The RMS must include detailed methodologies for all works to be undertaken, site management procedures, proposed remediation objectives and remediation criteria. The approved RMS must be carried out in its entirety and the Local Planning Authority must be given two weeks written notification prior to the commencement of the remedial works. Following completion of the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation must be submitted to and approved in writing by the LPA.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
23. Prior to commencement of development, a noise survey shall be undertaken and a report submitted. The survey shall be undertaken by a competent person and shall include periods for daytime as 0700-2300 hours and night-time as 2300-0700 hours and identify appropriate noise mitigation measures. All residential units shall thereafter be designed so as not to exceed the noise criteria based on BS8233-Guidance on sound insulation and noise reduction for buildings, given below:
- Dwellings indoors in daytime: 35 dB LAeq,16 hours
- Outdoor living area in daytime: 50 dB LAeq,16 hours
- Inside bedrooms at night-time: 30 dB LAeq,8 hours (45 dB LAmax)
- Outside bedrooms at night-time: 45 dB LAeq,8 hours (60 dB LAmax)
The report shall also consider noise from existing and proposed fixed plant or machinery (e.g. heat pumps, compressors, extractor systems, fans, pumps, air conditioning plant or refrigeration plant) can be annoying and disruptive. This is particularly the case when noise is impulsive or has tonal characteristics. A noise assessment should therefore be submitted to include all proposed plant and machinery and be based on BS4142:2014. A rating level (LAeq) of at least 5dB below the typical background (LA90) should be achieved. Where the rating level cannot be achieved, the noise mitigation measures considered should be explained and the achievable noise level should be identified and justified. This shall be based on BS4142:2014 Methods for rating and assessing industrial and commercial sound. All detail and appropriate consequential noise mitigation measures shall have been agreed, in writing, by the Local Planning Authority and shall be implemented prior to occupation of any building on the site and shall be maintained as agreed thereafter.
Reason: To ensure that noise from the commercial development is not detrimental to the residential amenity of neighbouring residents.
24. No piling operations shall be undertaken unless the details and method of piling is previously agreed in writing with the Local Planning Authority.
Reason: In the interest of amenity and protection of the local environment.
25. Prior to the commencement of development, a Construction Management Plan, to identify how the potential for nuisance from demolition/construction site dust, noise and light will be controlled, shall be submitted to and approved in writing by the local planning authority. This should include site working times and should be agreed and approved by the LPA prior to any work on site taking place. All construction works shall be carried out in accordance with the approved Construction Management Plan.
Reason: In the interests of amenity, highway safety and protection of the local environment.
26. There shall be no burning of any material on site.
Reason: In the interest of residential amenity.
27. Prior to occupation of any of the properties (residential or commercial) hereby permitted, a management plan for maintenance of the communal areas to include, but not limited to, the access road, parking and turning areas and the landscaped areas shall have been submitted to and approved in writing by the local planning authority. The maintenance plan should include long term design objectives, management responsibilities and a scheme of maintenance for both the hard and soft landscaped areas for a period of at least 20 years. The schedule should include details of the arrangements for its implementation. The development shall be carried out in accordance with the approved management plan.
Reason: To ensure the communal areas are properly maintained in the interest of visual amenity.
28. Within 3 months of commencement of development, precise details of a scheme of landscape works (which term shall include tree and shrub planting, grass, earthworks, driveway construction, parking areas patios, hard surfaces etc, and other operations as appropriate) at a scale not less than 1:200 shall be submitted to and approved in writing by the local planning authority.
Reason: To ensure that there is a well laid out landscaping scheme in the interest of visual amenity.
29. The approved landscaping scheme shall be implemented not later than the first planting season following commencement of the development (or within such extended period as the local planning authority may allow) and shall thereafter be retained and maintained for a period of 5 years. Any plant material removed, dying or becoming seriously damaged or diseased within five years of planting shall be replaced within the first available planting season and shall be retained and maintained.
Reason: To ensure the submission and implementation of a well-laid out scheme of landscaping in the interest of visual amenity.
30. Within 6 months of the commencement of development, precise details of all of the means of enclosure (i.e. hedgerows, fences, gates, walls etc.) shall have been submitted to and approved by the Local Planning Authority. Prior to occupation of any of the dwellings or commercial units hereby approved, all boundary treatments shall The approved means of enclosure shall thereafter be retained in their approved form.
Reason: In the interests of visual and residential amenity.
31. Prior to occupation of the 5th dwelling hereby permitted, all three of the commercial units shall have been completed and be made ready for occupation.
Reason: To ensure that the commercial units are delivered in a timely manner ensuring the supply of community infrastructure within the District Centre.
32. Prior to the use commencing, details of an external lighting scheme shall be submitted to and approved by the Local Planning Authority. This scheme shall thereafter be implemented and retained in its approved form.
Reason: In the interests of amenity, and protection of the local rural environment, including the ecological environment.
33. The three commercial units hereby permitted shall be used for purposes within Class E as set out in The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020.
Reason: For the avoidance of doubt as to what has been considered and approved.
Informatives:
1. The Local Planning Authority has assessed the proposal against all material considerations including planning policies and any comments that may have been received. The planning application has been approved in accordance with the objectives of the National Planning Policy Framework and local plan to promote the delivery of sustainable development and to approach decision taking in a positive way.
2. East Suffolk Council is a Community Infrastructure Levy (CIL) Charging Authority. The proposed development referred to in this planning permission may be chargeable development liable to pay Community Infrastructure Levy (CIL) under Part 11 of the Planning Act 2008 and the CIL Regulations 2010 (as amended). If your development is for the erection of a new building, annex or extension or the change of use of a building over 100sqm in internal area or the creation of a new dwelling, holiday let of any size or convenience retail , your development may be liable to pay CIL and you must submit a CIL Form 2 (Assumption of Liability) and CIL Form 1 (CIL Questions) form as soon as possible to CIL@eastsuffolk.gov.uk A CIL commencement Notice (CIL Form 6) must be submitted at least 24 hours prior to the commencement date. The consequences of not submitting CIL Forms can result in the loss of payment by instalments, surcharges and other CIL enforcement action. CIL forms can be downloaded direct from the planning portal: https://www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy/5 Guidance is viewable at: https://www.gov.uk/guidance/community-infrastructure-levy
3. The applicant is advised that the proposed development may require the naming of new street(s) and numbering of properties/businesses within those streets and/or the numbering of new properties/businesses within an existing street. This is only required with the creation of a new dwelling or business premises. For details of the address charges please see our website www.eastsuffolk.gov.uk/planning/street-naming-and-numbering or email llpg@eastsuffolk.gov.uk
4. In relation to Condition 5, details of cycle storage sheds are not yet provided. Sheds are usually located in private secure gardens. Residential Long term Cycle Storage in Communal Areas needs appropriate security measures Sheffield stands are suitable for short term customer/visitor parking but not for longer term employee cycle parking.
5. In relation to Condition 10, the Transport Statement has suggested timings of delivery windows and maximum service vehicle types and sizes (Rigid 10.5m or 12m length).
6. It is an OFFENCE to carry out works within the public highway, which includes a Public Right of Way, without the permission of the Highway Authority. Any conditions which involve work within the limits of the public highway do not give the applicant permission to carry them out. Unless otherwise agreed in writing all works within the public highway shall be carried out by the County Council or its agents at the applicant's expense. The works within the public highway will be required to be designed and constructed in accordance with the County Council's specification. The applicant will also be required to enter into a legal agreement under the provisions of Section 278 of the Highways Act 1980 relating to the construction and subsequent adoption of the highway improvements. Amongst other things the Agreement will cover the
specification of the highway works, safety audit procedures, construction and supervision and inspection of the works, bonding arrangements, indemnity of the County Council regarding noise insulation and land compensation claims, commuted sums, and changes to the existing street lighting and signing.
7. The infiltration rate used for design purposes is (21.39mm/hr), a figure obtained through a soakage test undertaken at Trial Pit Number SA05. The soakage test was undertaken at a depth of 5.0mBGL, whereas the invert level of the soakaway is proposed at 4.1mBGL, presenting concerns as to whether the proposed infiltration rate is a realistic representation of the actual infiltration rate at the depth of the soakaway. It is noted that the proposed 4.1mBGL invert level is situated on the border of the clay and sand layers identified within the borehole associated with SA05. It is recommended that further infiltration testing, in accordance with BRE 365, is undertaken at the location of the proposed soakaway. The depth of the soakage test should be in accordance with the invert level of the proposed soakaway to provide an accurate representation of the infiltration capacity at the proposed soakaway location. The additional soakaway tests would also demonstrate whether the clay layer close to the proposed invert level would have an adverse impact on the achievable infiltration rate. The half empty time of the soakaway design is 13,634 minutes (227.23 hours), significantly above the maximum 24 hours requirement. The design should ensure there is sufficient storage for both the 1:100 +40% and 1:10 +40% event combined as the half drain times are insufficient. It would be useful to understand where the pollution mitigation indecencies associated with the proposed Polypipe Permaceptor Diffuser derive from as this information does not appear to be present within table 26.4 of the CIRIA SuDs Manual as suggested within the Drainage Strategy.
8. Suffolk Fire and Rescue Service recommends that proper consideration be given to the potential life safety, economic, environmental and social benefits derived from the provision of an automatic fire sprinkler system.
9. The applicant's attention is drawn to the comments from the Designing Out Crime Officer and it is encouraged that as many of these suggestions are incorporated into the scheme to help achieve a safe environment.